
Karachi:
CEO Water Corporation Engineer Syed Salahuddin Ahmed visited University Road late at night and reviewed the ongoing repair work there.
According to the Water Corporation spokesperson, the CEO received full details regarding the repair of the 84-inch dia water line.
During the visit, the Chief Engineer briefed the CEO about the repair work and informed about the current progress.
The CEO directed the officers to complete the repair work as soon as possible so that there is no disruption in the water supply to the citizens.
According to the orders issued by the CEO, it has been directed to speed up the repair work and complete all necessary measures to provide convenience to the citizens.
